Project Description

Bearing failure caused the motor to trip on overload. Due to the site not having a spare motor, EMC stripped the motor, replaced the defective bearings and replaced the lip seals. The motor was then rebuilt and thoroughly tested along with electrical tests and returned back in to service within 24 hours.